| 1969 - 584 páginas
...equipped and loaded lifeboat and the measurements taken at each 25 percent Increments. (Water §160.035-13 may be used for all or any portion of the weight if...noted in § 160.035-11 (a) for metal lifeboats and § 160.035-12 (a) for F.RP. lifeboats. In addition, motors and hand-propelling gear when installed... | |
| 1967 - 484 páginas
...center of each thwart span. The thwarts shall not fracture or otherwise be rendered unserviceable. (в) Towing test. With a towline rigged around the forward...noted in § 160.035-11 (a) for metal lifeboats and § 160.035-12 (a) for P.RP. lifeboats. In addition, motors and hand-propelling gear when installed... | |
| 1962 - 1190 páginas
...Tanks and lockers. Equipment tanks and watertight lockers shall be tested with not less than 1.0 p.sl. of air pressure both before and after the tests described...approved subsequent lifeboats of the same design shall be mdividually Inspected and tested as noted in § 160.035-11(a) for metal lifeboats and § 160.035—12(a)... | |
| 1968 - 500 páginas
...1.0 psl of air pressure both before and after the tests described in subparagraphs (1) through (в) of this paragraph. § 160.035-13 Testing and inspection...noted in § 160.035-11 (a) for metal lifeboats and § 160.035-12 (a) for P.RP. lifeboats. In addition, motors and hand-propelling gear when installed... | |
| 1996 - 440 páginas
...pressure both before and after the tests described in paragraphs (b)(l) through (6) of this section. §160.035-13 Testing and inspection after approval....shall be individually inspected and tested as noted in §160.035-ll(a) for metal lifeboats and paragraph (b) of this section for PBP. lifeboats. In addition,... | |
| 2000 - 442 páginas
...paragraphs (b)(l) through (6) of this section. §160.035-13 Testing after approval. and inspection (a) General. After the design of a lifeboat has been...shall be individually inspected and tested as noted in § 160.035-ll(a) for metal lifeboats and paragraph (b) of this section for PBP. lifeboats. In addition,... | |
| 1954 - 1812 páginas
...condition over a measured course of not less than 1.000 feet. <e) Testing and inspection after approval. After the design of a lifeboat has been approved,...shall be individually inspected and tested as noted in paragraph (a) of this section. In addition, motors and hand-propelling gear when installed shall be... | |
| 1958 - 980 páginas
...condition over a measured course of not less than 1,000 feet. (e) Testing and inspection after approval. After the design of a lifeboat has been approved,...shall be individually inspected and tested as noted in paragraph (a) of this section. In addition, motors and hand-propelling gear when installed shall be... | |
| 1969 - 590 páginas
...Tanks and lockers. Equipment tanks and watertight lockers shall be tested with not less than 1.0 psl of air pressure both before and after the tests described...(6) of this paragraph. § 160.035—13 Testing and inspectiea after approval. (a) GeneraZ. After the design of a lifeboat has been approved subsequent... | |
| 1966 - 480 páginas
...to equal the weight of the equipment, food, water, and persons to be carried (see § 160.035-11 (b) (2) (ii)), and the length, beam, and depth measured....noted in §160.035-11 (a) for metal lifeboats and § 160.035-12 (a) for P.RP. lifeboats. In addition, motors and hand-propelling gear when installed... | |
| |