| 1914 - 162 páginas
...includ ing the outside of the vessel's bottom, and the inside and outside of the boilers. This survey shall be such as to insure that the arrangements, material, and scantlings of the hull, boilers, and their appurtenances, main and auxiliary machinery, life-saying appliances and other... | |
| United States. Congress. Senate. Committee on Foreign Relations - 1935 - 184 páginas
...section 375, have the force of law.) 6. In regulation XXII of the convention the survey of the ship " shall be such as to insure that the arrangements, material, and scantlings of the hull, boilers, and their appurtenances, main and auxiliary machinery, * * * fully comply with the requirements... | |
| United States. Congress. House. Committee on Merchant Marine and Fisheries - 1938 - 204 páginas
...including the outside of the ships bottom and the inside and outside of the boilers (when installed). This inspection shall be such as to insure that the arrangements, material, and scantlings of the hull, boilers, and their appurtenances, as well as main and auxiliary machinery, steering gear, lifesaving... | |
| 1939 - 1192 páginas
...including the outside of the vessel's bottom and the inside and outside of the boilers. This survey shall be such as to insure that the arrangements, material and scantlings of the hull, boilers, and their appurtenances, main and auxiliary machinery, life saving appliances, fire... | |
| 1969 - 538 páginas
...list of plans to be supplied is set forth in Subpart 71.65. §71.20—15 Scope of inspections. (a) The initial inspection, which may consist of a series...insure that the arrangements, material, and scantlings Title 46 — Chapter I of the structure, boilers and other pressure vessels and their appurtenances,... | |
| 1976 - 200 páginas
...the list of plans to be supplied is set forth in Subpart 91.55. § 91.20-15 Scope of inspection. (a) The initial inspection, which may consist of a series...vessels, equipment and the inside and outside of the toilers. The inspection shall be such as to insure that the arrangements, material, and scantlings... | |
| 1997 - 186 páginas
...plans and the list of plans to be supplied is set forth in subpart 71.65. (b) [Reserved] § 71 .20-15 Scope of inspections. The initial inspection, which...the outside of the vessel's bottom, the machinery, untired pressure vessels, equipment and the inside and outside of the boilers. The inspection shall... | |
| 1974 - 188 páginas
...the list of plans to be supplied is set forth in Subpart 91.55. § 91.20-15 Scope of inspection. (a) The initial inspection, which may consist of a series...the outside of the vessel's bottom, the machinery, unflred pressure vessels, equipment and the inside and outside of the boilers. The inspection shall... | |
| 1969 - 546 páginas
...plans to be supplied is set forth in Subpart 91.55. §91.25-10 § 91 .20-1 5 Scope of inspection. (a) The initial inspection, which may consist of a series...the outside of the vessel's bottom, the machinery, unflred pressure vessels, equipment and the inside and outside of the boilers. The inspection shall... | |
| |