Imágenes de páginas
PDF
EPUB
[merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

DONOR CERTIFICATION: I certify that I provided my urine specimen to the collector; that the specimen bottle was sealed with a tamper-proof seal in my presence; and that the information provided on this form and on the label affixed to the specimen bottle is correct.

[blocks in formation]

TO BE COMPLETED BY PERSON COLLECTING SPECIMEN AFTER DONOR HAS COMPLETED SECTION VII-(See Copy 3 of Form)
VIII.
COLLECTOR'S NAME-PRINT (first, middle, last)

COLLECTION SITE LOCATION

DATE OF COLLECTION

REMARKS CONCERNING COLLECTION:

Split sample collected in accordance
with applicable Federal requirements. Yes □ No

I certify that the specimen identified on this form is the specimen presented to me by the donor providing the certification on Copy 3 of this form, that it bears the same identification number as that set forth above, and that it has been collected, labelled and sealed as in accordance with applicable Federal requirements.

SIGNATURE OF COLLECTOR:

COPY 5-COLLECTOR

[merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

DONOR CERTIFICATION. I certify that I provided my urine specimen to the collector, that the specimen bottle was sealed with a tamper-proof seal in my presence, and that the information provided on this form and on the label affixed to the specimen bottle is correct.

[blocks in formation]

TO BE COMPLETED BY PERSON COLLECTING SPECIMEN AFTER DONOR HAS COMPLETED SECTION VI-(See Copy 3 of Form)
COLLECTOR'S NAME-PRINT (first, middle, last)
VIII.

COLLECTION SITE LOCATION

DATE OF COLLECTION

REMARKS CONCERNING COLLECTION:

Split sample collected in accordance
with applicable Federal requirements. Yes

□ No

I certify that the specimen identified on this form is the specimen presented to me by the donor providing the certification on Copy 3 of this form, that it bears the same identification number as that set forth above, and that it has been collected, labelled and sealed as in accordance with applicable Federal requirements.

SIGNATURE OF COLLECTOR:

COPY 6-EMPLOYER

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

TO BE COMPLETED BY PERSON COLLECTING SPECIMEN AFTER DONOR HAS COMPLETED SECTION VII-S∞ Copy 3 of Form)
VIII.
COLLECTOR'S NAME-PRINT (first, middle, last)

COLLECTION SITE LOCATION

DATE OF COLLECTION

REMARKS CONCERNING COLLECTION:

Split sample collected in accordance
with applicable Federal requirements. Yes □ No

I certify that the specimen identified on this form is the specimen presented to me by the donor providing the certification on Copy 3 of this form, that It bears the same identification number as that set forth above, and that it has been collected, labelled and sealed as in accordance with applicable Federal requirements.

[blocks in formation]

THE RESULTS FOR THE ABOVE IDENTIFIED SPECIMEN ARE IN ACCORDANCE WITH THE APPLICABLE SCREENING AND CONFIRMATION CUTOFF LEVELS ESTABLISHED BY THE HHS MANDATORY GUIDELINES FOR FEDERAL WORKPLACE DRUG TESTING PROGRAMS (found only on copies one and two):

[blocks in formation]

X.

I have reviewed the laboratory results for the specimen identified by this form in accordance with applicable Federal requirements. My final determination/ verification is: II POSITIVE

(Check one) II NEGATIVE

[blocks in formation]
[blocks in formation]

$41.100 Purpose and applicability.

(a) This part implements the provisions of 49 U.S.C. 7701 et seq. and Executive Order (E.O.) 12699, "Seismic Safety of Federal and Federally-Assisted or Regulated New Building Construction" (3 CFR, 1990 Comp., p. 269). Under the Executive Order the DOT is given the responsibility for developing and implementing its own mission-appropriate and cost-effective regulations governing seismic safety.

(b) This part applies to new DOT owned buildings and to new DOT leased, assisted and regulated buildings. The purpose of this part is to reduce risk to lives of the building occupants, improve the capabilities of essential buildings to function during or after an earthquake, and to reduce earthquake losses of public buildings and investments.

(c) This part may be further implemented by the DOT Operating Administrations.

841.105 Definitions.

As used in this part

Operating Administration includes the Office of the Secretary.

DOT means the U.S. Department of Transportation.

841.110 New DOT owned buildings

and additions to buildings.

(a) DOT Operating Administrations responsible for the design and construction of new DOT Federally owned buildings will ensure that each building is designed and constructed in ac

cord with the seismic design and construction standards set out in §41.120 of this part.

(b) This section pertains to all building projects for which development of detailed plans and specifications was initiated after January 5, 1990. It applies to additions to existing buildings as well as to new buildings. It applies worldwide.

(c) For DOT Federally owned buildings, a certification of compliance with the seismic design and construction requirements of this part is required prior to the acceptance of the building. Such statements of compliance may include the engineer's and architect's authenticated verifications of seismic design codes, standards, and practices used in the design and construction of the building, construction observation reports, local or state building department plan review documents, or other documents deemed appropriate by the DOT Operating Administration.

841.115 New buildings to be leased for DOT occupancy.

(a) DOT Operating Administrations responsible for the design and construction of new buildings to be leased for DOT occupancy or use will ensure that each building is designed and constructed in accord with the seismic design and construction standards set out in § 41.120 of this part.

(b) This section pertains to all new building projects for which the agreement covering development of detailed plans and specifications was executed after January 5, 1990.

(c) For new Federally leased buildings, a certification of compliance with the seismic design and construction requirements of this part is required prior to the acceptance of the building. Such statements of compliance may include the engineer's and architect's authenticated verifications of seismic design codes, standards, and practices used in the design and construction of the building, construction observation reports, local or state building department plan review documents, or other documents deemed appropriate by the DOT Operating Administration.

[blocks in formation]

(a) Each DOT Operating Administration assisting in the financing, through Federal grants or loans, or guaranteeing the financing, through loan or mortgage insurance programs, of newly constructed buildings will ensure that any building constructed with such assistance is constructed in accord with seismic standards set out in §41.120 of this part.

(b) This section applies to new buildings and additions to existing buildings financed in whole or in part through Federal grants or loans administered by DOT Operating Administrations, or through guaranteed financing through loan or mortgage insurance programs administered by DOT Operating Administrations.

(c) Any building constructed with Federal financial assistance, after July 14, 1993 must be designed and constructed in accord with seismic standards approved by the DOT operating Administration under §41.120 of this part in order to be eligible for Federal financial assistance.

(d) For buildings built with Federal financial assistance, a certification of compliance with the seismic design and construction requirements of this part is required prior to the furnishing of such assistance. Such statements of compliance may include the engineer's and architect's authenticated verifications of seismic design codes, standards, and practices used in the design and construction of the building, construction observation reports, local or state building department plan review documents, or other documents deemed appropriate by the DOT Operating Administration.

841.119 DOT regulated buildings.

(a) Each DOT Operating Administration with responsibility for regulating the structural safety of buildings and additions to existing buildings will ensure that each DOT regulated building is designed and constructed in accord with seismic design and construction standards as provided by this part.

(b) This section pertains to all new building projects for which development of detailed plans and specifications begin after July 14, 1993.

(c) Any building for which a DOT Operating Administration responsible for regulating the structural safety must comply with the seismic design and construction standards in this part.

(d) For DOT regulated buildings a certification of compliance with the seismic design and construction requirements of this part is required prior to the acceptance of the building. Such statements of compliance may include the engineer's and architect's authenticated verification of seismic design codes, standards, and practices used in the design and construction of the building, construction observation reports, local or state building department plan review documents, or other documents deemed appropriate by the DOT Operating Administration.

$41.120 Acceptable model codes.

(a) This section describes the standards that must be used to meet the seismic design and construction requirements of this part.

(b) (1) The following are model codes which have been found to provide a level of seismic safety substantially equivalent to that provided by use of the 1988 National Earthquake Hazards Reduction Program (NEHRP) Recommended Provisions (Copies are available from the Office of Earthquakes and Natural Hazards, Federal Emergency Management Agency, 500 C Street, SW., Washington, DC 20472.):

(i) The 1991 International Conference of Building Officials (ICBO) Uniform Building Code, published by the International Conference of Building Officials, 5360 South Workman Mill Rd., Whittier, Cal. 90601;

(ii) The 1992 Supplement to the Building Officials and Code Administrators International (BOCA) National Building Code, published by the Building Officials and Code Administrators, 4051 West Flossmoor Rd., Country Club Hills, Ill. 60478-5795; and

(iii) The 1992 Amendments to the Southern Building Code Congress (SBCC) Standard Building Code, published by the Southern Building Code Congress International, 900 Montclair Rd., Birmingham, Ala. 35213-1206.

(2) Versions of the NEHRP seismic maps have been adopted along with the NEHRP Recommended Provisions into

« AnteriorContinuar »