Kilbourn City bridge

55,000 00

Draw bridge, Milwaukee, $11,000; draw bridge,
Portage, $3,500 ..

[blocks in formation]

Masonry and bridging N. La Crosse to Miss. river.. Culvert masonry, pile frame and timber culverts, road bridges, pile abutments, plank boxes and and drains, cattle guards, highway crossings, road signs and whistling posts.....

77,000 00

195,000 00

$476, 580 00

SCHEDULE 9.

$149,883 00 34, 010 00 800 00

2,331 ms. spikes, F bars and bolts, @$643.
Extra cost of side tracks, 35, 8ms, @$950
2 R. R. crossings...

Amount

Estimated cost of superstructure of one mile of main track.

$184,693 00

[blocks in formation]

To laying and surfacing at S. G., loading and unloading

1,320 00
400 00

[blocks in formation]
[blocks in formation]
[blocks in formation]

Totals

221,500 110, 100 9,400 64, 100 131,700 35,100, 512,500

1 Furniture, twenty-eight stations. 2 Twenty-five cattle yards. Hand car houses.

[blocks in formation]

sort fencing, etc...

tion.

Iron rails,.. [No. miles, 38.83; lbs. wt. per yd. 60].
Chairs, spikes, fish-bar, etc

Laying track $400, ballasting $1,000.

Total cash valuation of superstructure.. Passengers stations and fixtures, as per schedule Freight stations and fixtures, as schedule....... Wood sheds and water stations and miscellaneous, as per schedule; ....

Fencing;..

Total cash valuation of buildings of every

Engineering expenses before and during construc

Salaries of officers and agents essential during construction ...

Total cost of engineering and official management during construction...

Total cash value of line unequipped.....

Two Railroad Crossing in Madison Depot Grounds.

292, 778

27,478

54,362

425,873

14, 700

...[No., 2] [No., miles, 36]|

4,800

28,800

48,300

29, 600

6,100

35.700

$1,030,073

[blocks in formation]

Culverts, bridges, road crossings and signs, cattle guards, etc...

$56,000

[blocks in formation]
[blocks in formation]

Iron rails: [No. miles, 118.5; lbs. wt. per yard, 60]
Chairs, spikes, fish-bars, etc., schedule* 9...
Laying track, $400; ballasting, $1,000....

893,490

90,885

165, 900

Machine shops, as per schedule...

Total cash valuation of superstructure.

Passenger stations and fixtures, as per schedule.

Freight stations and fixtures, as per schedule...
Engine and car shops, as per schedule..

Machinery and fixtures, as per schedule

1,306, 695

102,400

249, 100

Engine houses, as per schedule

35,000

Turn tables, as per schedule

3,600

Wood sheds and water stations, and miscellaneous, as per schedule..

61,000

Fencing

.......

80,000

Elevators, as per schedule..

Total cash valuation of buildings of every sort, fencing, etc. ..

93,000

624, 100